RAMALLAH, December 31, 2008 (WAFA)- The overall Construction Cost Index (CCI) for the West Bank excluding
Analysis of Construction Cost developments for November indicates decreases in certain costs. The largest decrease was in building iron cost (- 16.00%) followed by metal tools cost (- 2.29%) and the smallest decrease was in cement products (-0.53%) followed by aluminum and metal doors and windows (-0.73%).
At the same time, there were increases in other costs; the highest was in wages and labor cost (+ 2.87%) and in ceramic products (+0.70%) and the smallest increase was in the cost of hired equipment (+ 0.11%).